Master Bath Remodel (before & after)

Just wrapped up a major updating/remodel of our master bath. Very happy with the way things turned out. Took longer than expected and there was a lot of details that came up that never crossed my mind we would have to make decisions on.

The before bathroom was as you can see mostly cedar tongue and groove and wallpaper on the walls. The bath was not very functional for a family with just one sink, a tub and a toilet. In the end we ended up with 2 sinks, a walk in shower, a stand alone tub and a separate water closet for the toilet.

We added a lot of custom touches. The tile and stone came out awesome, faux grey wood floor tile throughout the room with a very unique basket weave in the shower and we also did a mat with the basket weave in the middle of the room. In the shower there’s a stone bench that floats through the wall and provides a bench on the other side. With the water closet (not shown) we put in a window to provide natural light. Also added heated floors.

We did our best to stick to budget but we came out a little over, we did also decide that we just wanted it done how we wanted it done and didn’t worry about trying to cut costs. It was a pretty fun experience and we’re are happy after 10 years take showers in our master bath.

Jeremy

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s